The spare-parts problem
Presses, kiln lines, glazing lines and handling equipment in ceramics plants often rely on imported spares. When a part fails unexpectedly, waiting for delivery can stop production for longer than the repair itself would take.
Parts that are often made locally
- Shafts, pins, bushes and rollers
- Gears and couplings, subject to design review
- Brackets, guides and machine guards
- Fabricated supports and conveyor parts
Getting the details right
A good replacement needs the right material, fits and tolerances. Where the original drawing is not available, the part is measured and the key details are agreed with the plant engineer before machining. For parts under the machine builder's warranty, check the warranty terms first.
Building a local spares list
Identify the parts that fail most often and take the longest to import. Preparing drawings and approved suppliers for these parts in advance turns an emergency into a routine order.
Send your requirement
Share the part name, photos, drawings or the worn sample, the machine it belongs to and the quantity needed. We will advise whether machining, repair or a revised design is the better route.